7 Best Project Scheduling Techniques

7 Best Project Scheduling Techniques

Empower yourself professionally with a personalized consultation,

no strings attached!

In this article

In this article

Article Thumbnail

Project Management is dynamic as it ensures businesses run effectively and efficiently. Individuals undergo certifications when they learn how to do this correctly. Project management enables individuals to get into leadership roles where they plan and manage different projects. The understanding of the role ensures all the objectives of a project alongside the deliverable are adhered to at the right time and within the budget. Project managers foster great collaboration and communication between different teams. Additionally, the best project Scheduling Techniques will help provide insights driven by data to make better decisions in terms of business.

In this blog, we'll discuss different types of Project Management Scheduling. These scheduling techniques include all the actions associated with implementing and applying the project within the definitive time period.

Why are Scheduling Techniques Important?

By the looks of it, an organization's scheduling techniques help align the scope, the resources at disposal, and the project timeline. Project scheduling and project schedule management are different sides of the same coin. Delivering a project or its expected time frame still represents the fundamental motives where both disciplines shine.

With project management and project scheduling, there are several variables, uncertainties, and possibilities concerning resource availability and scope; hence, creating a project schedule is challenging but possible. The following are some of the most alluring types of Scheduling Techniques that are well-suited for the IT realm to help you prepare a full-proof agenda.

Check:Project Management Challenges

Types of Scheduling in Project Management

In this blog, we'll discuss different types of Project Scheduling Techniques that entail different strategies. Without further ado, let's begin!

  1. Mathematical Analysis

The two most widely utilized methodologies by Project Managers are the Critical Path Method (CPM) and the Program Evaluation and Review Technique (PERT). These approaches are utilized to assess the project's time frame based on the project's scope baseline.

  • Critical Path Method (CPM): A critical path may be seen in any project's tree diagram. The Critical Path Method calculates the maximum and least time needed to finish a project. Using this strategy, you will handle your project's primary tasks and scope. With the Critical Path Method, you must anticipate all task execution durations and determine all predictable variables that may impact the development of your project. You will insert milestones in one of these types of Scheduling Techniques that must be reached at specific points in the Critical Path Method to guarantee all of your projects stay right on schedule. Critical Path Method also aids in the identification of key activities that should be included in a project. Adjustments in delivery times do not affect the timetable. Critical Path Method requires the project's scope and a set of actions required to complete the project. Following that, the time spent on each action is computed. The dependent variables are then determined. This aids in the identification and separation of the independent variables. Lastly, it includes project milestones.
  • Program Evaluation and Review Technique or PERT: This technique is a method for planning the flow of activities in a project and estimating the overall time required to finish it. This approach illustrates how each activity is interdependent on the others. For scheduling a project with Program Evaluation and Review Technique, it is essential to identify activities, organize them logically, and set milestones. You can compute project deadlines based on your degree of confidence. Program Evaluation and Review Technique as standard scheduling methods calculate multiple timeframes using weighted average duration rather than guesses.
  1. Duration Compression

If necessary, Duration Compression can be used to shorten a timetable. If the project is being delayed, it can amend the stated agenda by making adjustments without altering the scope. There exist two options that can be employed here that are fast-tracking and crashing.

  • Fast Tracking: Another application of CPM is fast-tracking. Fast-tracking looks for ways to accelerate the rate with which a project is done, either by concurrently performing numerous activities or overlaying several tasks with each other. CPM assists us in identifying actions that may be employed to accelerate the project's speed. While it is an enticing strategy, it has dangers. Because multiple actions will be carried out simultaneously, mistakes might be made, and then the quality of work will be compromised.
  • Crashing: Crashing is employing extra resources to complete a project on schedule. You must have additional resources at your availability for it to transpire. Furthermore, more resources will be needed to meet all activities. The need to add other team members to a project and restricted work divisibility results in increased communication and is the primary cause for it. The crashing approach may also be employed by increasing time, which is paid overtime. However, it must stay within the agreed-upon deadline. Regrettably, this increases the project's cost which suggests a flipside to different types of Scheduling Techniques.
  1. Simulation

The project's projected time is computed by simulating various tasks. The schedule is built on approximations. Thus, it may be utilized even if the scope changes or the activities need to be better defined. If your project has a lot of ambiguous factors and uncertain outcomes, the simulation might assist you in optimizing your project's timetable. You will create a schedule based on assumptions, which will be helpful if you still need to be completely aware of all of the tasks associated with the project or if any specifics of your scope alter. Although you may not be aware of all the variables involved, you will want to account for any potential ambiguities and scope changes to make your timeline reasonable and feasible.

  1. Task List

The task list is the most fundamental and widely used standard scheduling methods making it extremely accessible. The catalog of all conceivable tasks associated with the project is recorded in an Excel sheet or word processor. This is the most straightforward and most commonly used approach. It comes in handy while working on little tasks. However, a task list is not a viable technique for massive projects with various factors to be considered.

  1. Resource Leveling Heuristics

The term "resource leveling heuristics" refers to reducing delivery time or preventing under or overconsumption of resources by adjusting the schedule and resources. Roles are divided following the available resources so that every resource is appropriately used and used.

Throughout standard scheduling methods, there is potential for rearranging your schedule or how you depend on specific resources. Focus on the tasks in the project schedule and optimize your resource usage so that they aren't underutilized or overutilized in your project. You may organize your tasks all around available resources, such as your team members, so that they contribute an equal balance of work in your project. The disadvantage of this strategy is that it may result in lengthier project timeframes and expenditures.

  1. Gantt Chart

The Gantt Chart is a visualization tool used in project management to monitor progress and review objectives. Project managers utilize it for much of the duration to estimate the mean time required to complete a project. A Gantt chart in the project schedule acts as a bar chart that depicts essential activities in chronological order in order of time. Each task is displayed by a line that shows the activity's initiation and concluding date and its runtime.

  1. Crashing

Crashing allows project managers worldwide to get more resources that will aid you and your entire team complete a project in a specified time. As one of the most standard scheduling methods worldwide, crashing comprises assigning additional team members concerning a project. Furthermore, this also reduces the overall workload, which will make things easier. Crashing also allows project managers to have some employees and teamwork a little longer by working overtime and quickly meeting deadlines.

Conclusion

In closing, types of scheduling techniques are the hidden gems concerning the whole project management landscape. These techniques represent the compass which ensures projects reach the designated destination by staying on course. Having a meticulous plan, monitoring progress, allocating resources enables project managers to become very effective in their jobs.

The world runs parallel with project timeliness and with increase in complexity, all these techniques aren’t just advantageous, but also essential. Furthermore, they also instill disciplines regarding executing a project. In addition to this, project management also provides a framework so robust that risk mitigation becomes a seamless process and increases the quality of deliverables. With these methods, standard scheduling methods deliver great value to end-users and stakeholders.

Join the Discussion

By providing your contact details, you agree to our Privacy Policy

Related Articles

Project Leader Roles and Responsibilities

May 02 2024

What is Project Management Triangle?

Apr 11 2022

Everything You Need to Know About Project Charter

Jul 14 2022

PRINCE2 Certification Levels

Sep 07 2021

PRINCE2 Project Board

Apr 01 2024

Empower yourself professionally with a personalized consultation, no strings attached!

Our privacy policy © 2018-2024, Simpliaxis Solutions Private Limited. All Rights Reserved

Get coupon upto 60% off

Unlock your potential with a free study guide